Show simple item record

contributor authorBayard E. Bosserman
contributor authorMaurice E. Ford
date accessioned2017-05-08T22:39:02Z
date available2017-05-08T22:39:02Z
date copyrightSeptember 1984
date issued1984
identifier other%28asce%290733-9364%281984%29110%3A3%28375%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85056
description abstractThis paper describes the history, development, implementation, and benefits of a computerized master specification system established in a consulting engineering/architecture company. Besides reviewing the problems encountered in developing such a system, the paper quantifies computer costs and word processing labor hours expended in preparing technical specifications for several projects betwen 1980 and 1983. It compares these costs and labor hours to those expended using the traditional system of preparing specifications. The computerized specification system allows engineers to prepare technical specifications in one‐third to one‐half the time it takes using the traditional methods. Word processing or typing productivity increases by a factor of three to six.
publisherAmerican Society of Civil Engineers
titleDevelopment of Computerized Specifications
typeJournal Paper
journal volume110
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1984)110:3(375)
treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record