Show simple item record

contributor authorWilliam A. Eskins
date accessioned2017-05-08T22:38:53Z
date available2017-05-08T22:38:53Z
date copyrightMay 1998
date issued1998
identifier other%28asce%290733-9364%281998%29124%3A3%28173%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84968
description abstractThe new Coleman Bridge at Yorktown, Virginia, presented many unique construction challenges. During the Revolutionary War, Cornwallis scuttled his ships exactly where the new bridge was needed. The results of his action 200 years ago was that the designers and builders of the new bridge were forced to develop a construction plan that would not disturb these important artifacts. The designers determined that the bents of the old bridge could be widened to carry the load of the new bridge, and Tidewater Construction Corp. developed an ingenious floating installation technique for replacing the old bridge's superstructure.
publisherAmerican Society of Civil Engineers
titleCONSTRUCTION OF THE NEW COLEMAN BRIDGE: FIFTH ROEBLING LECTURE, 1997
typeJournal Paper
journal volume124
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1998)124:3(173)
treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record