Show simple item record

contributor authorFrancis Hartman
contributor authorPatrick Snelgrove
contributor authorRafi Ashrafi
date accessioned2017-05-08T22:38:21Z
date available2017-05-08T22:38:21Z
date copyrightDecember 1997
date issued1997
identifier other%28asce%290733-9364%281997%29123%3A4%28379%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84634
description abstractThis is the second paper addressing the results of an investigation into the subjective nature of contract interpretation. The first paper presented the findings of the investigation which showed how contracting parties interpret contract clauses differently. This paper reports the testing of a revised Canadian Standard Lump Sum Contract against its predecessor. The intent of this study was to measure the improvement of the wording-not in legal terms, but in terms of what the potential signatory to, or administrator of, the contract understood. The measure, as in the previous study, was the extent to which there was a “meeting of the minds” in interpretation of who was bearing particular risks. Unlike many contracts used today that are written by the owner or its representative, this standard form contract was drafted by a committee representing contractors and consultants, but not owners. An interesting observation was that owners were generally prepared to assume more risk than they perceived was being allocated to them while contractors wanted less risk.
publisherAmerican Society of Civil Engineers
titleEffective Wording to Improve Risk Allocation in Lump Sum Contracts
typeJournal Paper
journal volume123
journal issue4
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1997)123:4(379)
treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record