description abstractRehabilitation projects often suffer from delays and escalating costs. This may be attributed to a high degree of uncertainty in defining the scope of work for these projects during the design stage. This is particularly true for rehabilitation work on structures that suffered a catastrophe such as fire or war damage. Reasons for these problems are reviewed with emphasis on the role of the architect/engineer (A/E) in avoiding underestimation of required work during the stages of the project. Many common problems could be avoided if a more thorough survey was conducted of the damaged building at the initial design stage. Changes to the scope of work during the construction stage may cause serious delays and cost overruns. Recommendations are given to minimize ambiguities in the scope of work and avoid disputes among the parties to the contract. This can be achieved by employing an experienced A/E and by making sound decisions throughout the project span.
publisherAmerican Society of Civil Engineers
titleThe Architect/Engineer's Role in Rehabilitation Work
typeJournal Paper
journal volume123
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1997)123:1(1)
treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record