Show simple item record

contributor authorJusto De Jorge Moreno
contributor authorVirginia De Jorge Huertas
contributor authorOscar Rojas Carrasco
date accessioned2017-05-08T22:36:00Z
date available2017-05-08T22:36:00Z
date copyrightSeptember 2016
date issued2016
identifier other51376114.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83337
description abstractThis paper assesses technical efficiency and its determinants in the Spanish construction sector from a comparative perspective for the period 2000 to 2010 by using different parametric approaches in the form of stochastic frontier models. The main results reveal similar (no) influential factors on efficiency. For all models, the determinants found were capital intensity, prefinancial and postfinancial crisis periods, and workers’ skills. There was no difference in terms of sign and statistical significance. Firm age was positively related to efficiency in two of the three models. Firm size was not significant in any model. Finally, the average efficiency values obtained by the models are 55.3, 69.2, and 91.0%, suggesting the possibility of significant improvements in resource management.
publisherAmerican Society of Civil Engineers
titleAssessment of the Efficiency of the Spanish Construction Industry Using Parametric Methods: Case Study
typeJournal Paper
journal volume142
journal issue9
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001149
treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record