Show simple item record

contributor authorThanos Trezos
date accessioned2017-05-08T22:24:53Z
date available2017-05-08T22:24:53Z
date copyrightMay 1991
date issued1991
identifier other44296528.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/80170
description abstractThis paper describes a mixed integer programming model developed for the water management of Southern California Edison's Big Creek hydroelectric facility. It is an application paper—a review of past and present practice of an electric utility company engaged in the management of California's water resources. The model is deterministic with monthly decision variables and annual optimization horizons. The objective is the maximization of the total value of the produced energy. The model is primarily intended for long‐term planning purposes. However, the addition of a new power plant in 1987 reduced the guidance value of the recorded pattern of historical operations that have been improved based on dispatchers' experience over a long period of time. Consequently, the model is found to be very useful in determining short‐term (annual or semiannual) operating policies. Its principal output is a water‐release policy during on‐ and off‐peak periods for 12 consecutive months.
publisherAmerican Society of Civil Engineers
titleInteger Programming Application for Planning of Hydropower Production
typeJournal Paper
journal volume117
journal issue3
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1991)117:3(340)
treeJournal of Water Resources Planning and Management:;1991:;Volume ( 117 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record