description abstractThis paper presents an initial step in seeking to understand just how the adoption of advanced machine guidance technology, especially global positioning systems, leads to improvements in performance by the earthwork contractor. Two grading scenarios and one dozing scenario are examined based upon site observations and interviews with field personnel. Analysis demonstrated that productivity and unit cost improvements result from a reduction in surveying support, grade checking, an increase in operational efficiency, and a decrease in the number of passes. These results are in agreement with published results of benefits of 3D guidance over 2D guidance.
publisherAmerican Society of Civil Engineers
titleFactors in Productivity and Unit Cost for Advanced Machine Guidance
typeJournal Paper
journal volume128
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2002)128:5(367)
treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record