description abstractThe development of microcomputers is changing the nature of common construction management functions. The estimating function can now be used with greater ease to simultaneously evaluate the time required to perform different project activities and keep cost data related to cost control. While this procedure was time consuming for manual computation, it could be done in a reasonable amount of time when using microcomputers. This paper discusses the formation of a microcomputer system which can perform the functions of estimating, cost control, and scheduling at the same time. The procedure makes use of productivity of a crew of particular size, the materials and the equipment needed, to generate time data related to scheduling and cost data related to estimating and cost control. The software needed for implementing the system is an electronic spreadsheet program, a data base management program and a time management program available for most microcomputers at a relatively inexpensive cost.
publisherAmerican Society of Civil Engineers
titleConstruction Management Control with Microcomputers
typeJournal Paper
journal volume110
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1984)110:1(72)
treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record