Show simple item record

contributor authorTonny T. de Vries
contributor authorArif A. Anwar
date accessioned2017-05-08T22:10:14Z
date available2017-05-08T22:10:14Z
date copyrightMay 2015
date issued2015
identifier other37016451.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72757
description abstractIrrigation schedules are used in many irrigation schemes that operate on a rotational or arranged-demand basis. Determining these schedules is a complex problem, especially when done by hand. Operations research tools such as single machine scheduling are already used to schedule irrigation turns in systems where only one single user can irrigate simultaneously. This paper shows how multimachine scheduling can be used to determine arranged-demand schedules for systems where two or more users can irrigate at the same time. Two models are presented, as follows: (1) the simple multimachine scheduling model that establishes a schedule for systems where all outlets/user discharges are identical, and (2) the complex multimachine scheduling model that determines the schedule when flows to individual outlet/users are not necessarily identical.
publisherAmerican Society of Civil Engineers
titleIrrigation Scheduling Using Complex Machine Scheduling
typeJournal Paper
journal volume141
journal issue5
journal titleJournal of Irrigation and Drainage Engineering
identifier doi10.1061/(ASCE)IR.1943-4774.0000824
treeJournal of Irrigation and Drainage Engineering:;2015:;Volume ( 141 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record