Show simple item record

contributor authorStasha Jovanovic
contributor authorDragan Bozovic
date accessioned2017-05-08T22:09:51Z
date available2017-05-08T22:09:51Z
date copyrightMarch 2015
date issued2015
identifier other36531002.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72625
description abstractRailway networks stretch over thousands of kilometers and consist of a tremendous number of objects and components that exhibit markedly different behavior. The only effective manner in which a railway can manage the behavior of all of these objects and keep them under control to ensure traffic safety is to apply the condition-based approach to maintenance and renewal (M&R) planning, embodied by a versatile, dedicated railway maintenance management system (RMMS). The aim of this paper is to describe the optimal structure and manner of implementing an RMMS. For that reason, two case studies of railway maintenance management systems at two railways of different levels of sophistication are presented in this paper, demonstrating that a properly designed RMMS can be successfully implemented at clearly different railways, despite the key challenges of (1) access/acquisition of key data and interaction with the existing information technology environment, and (2) railways’ organizational structure and interaction with traditional M&R practices and procedures.
publisherAmerican Society of Civil Engineers
titleOptimal Structure and Two Case Study Implementations of a Railway Maintenance Management System
typeJournal Paper
journal volume31
journal issue2
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000260
treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record