description abstractThis paper aims at providing a fast near-optimum solution to the multimode resource-constrained project scheduling problem (MRCPSP) in large-scale projects, with and without resource-leveling constraints. The MRCPSP problem is known to be nondeterministic polynomial-time hard (NP-hard) and has been solved using various exact, heuristic, and metaheuristic procedures. In this paper, constraint programming (CP) is used as an advanced mathematical optimization technique that suits scheduling problems. The IBM
publisherAmerican Society of Civil Engineers
titleMultimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects
typeJournal Paper
journal volume31
journal issue6
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000338
treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record