contributor authorSadi A. Assaf
contributor authorMohammed Al-Khalil
contributor authorMuhammad Al-Hazmi
date accessioned2017-05-08T22:05:15Z
date available2017-05-08T22:05:15Z
date copyrightMarch 1995
date issued1995
identifier other18442778.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70921
description abstractThe present paper outlines the main causes of delay in large building projects in Saudi Arabia and their relative importance. A survey of a randomly selected sample of 24 contractors, 15 architectural/engineering firms (A/E), and nine owners from the Eastern Province of Saudi Arabia was undertaken. The survey included 56 causes of delay, and the respondents were asked to indicate their degree of importance. The delay factors were grouped into nine major groups. The level of importance of the causes and the groups were measured and ranked by their importance index for contractors, owners and A/Es. It was found that contractors, A/Es, and owners generally agree on the ranking of the individual delay factors. It was also shown that contractors and A/Es substantially agree on the ranking of the groups of delay factors, whereas contractors and owners, and A/Es and owners do not agree. It was also shown that the financing group of delay factors was ranked the highest by all three parties and that environment was ranked the lowest.
publisherAmerican Society of Civil Engineers
titleCauses of Delay in Large Building Construction Projects
typeJournal Paper
journal volume11
journal issue2
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)0742-597X(1995)11:2(45)
treeJournal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 002
contenttypeFulltext