Show simple item record

contributor authorM. Mahootchi
contributor authorK. Ponnambalam
date accessioned2017-05-08T22:03:30Z
date available2017-05-08T22:03:30Z
date copyrightJuly 2013
date issued2013
identifier other%28asce%29wr%2E1943-5452%2E0000311.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70125
description abstractIn this paper, a recently developed stochastic programming technique that includes reliability constraints is used to solve the operations optimization problem of the Parambikulam-Aliyar project (PAP), a multireservoir system in India. The use of reliability constraints as chance constraints in reservoir operations optimization have been around for some time, but is still a challenging problem because either the results are not good or they cannot be applied in problems with more than one or two reservoirs when such techniques depend on discretization. The new implementation of chance constraints based on a previous model extended to multireservoir systems provides better results than so far known. This work is easy to apply because it requires only a standard nonlinear programming solver.
publisherAmerican Society of Civil Engineers
titleParambikulam-Aliyar Project Operations Optimization with Reliability Constraints
typeJournal Paper
journal volume139
journal issue4
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)WR.1943-5452.0000261
treeJournal of Water Resources Planning and Management:;2013:;Volume ( 139 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record