Show simple item record

contributor authorAhmed Ibrahem Mosa
contributor authorMohamed El Esawey
date accessioned2017-05-08T22:03:02Z
date available2017-05-08T22:03:02Z
date copyrightDecember 2014
date issued2014
identifier other%28asce%29wr%2E1943-5452%2E0000056.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69862
description abstractThis paper reports on the design and implementation of an internet-based survey that focuses on household activity scheduling in Cairo, Egypt. The survey is referred to as Internet-based daily activity scheduling of household activities (IDASHA). The main emphasis of the survey was on different types of household interactions and coordination over a multiple-day period. The survey also collected detailed information about information and communication technology (ICT) usage and the role that telecommunications play in household interactions in the planning and scheduling process. The survey was conducted over one week during the months of March to May 2009. The final sample size included 42 households of married couples (i.e., 84 adults). The survey was evaluated according to several criteria, and was shown to provide a rich source of data while minimizing the burden on the survey respondents. Moreover, statistical analyses were carried out to investigate several issues such as time allocation behavior, weekly household interactions in activity participation, and the development of a
publisherAmerican Society of Civil Engineers
titleDesign and Implementation of an Internet-Based Household Activity Scheduling Survey in Cairo, Egypt
typeJournal Paper
journal volume140
journal issue4
journal titleJournal of Urban Planning and Development
identifier doi10.1061/(ASCE)UP.1943-5444.0000184
treeJournal of Urban Planning and Development:;2014:;Volume ( 140 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record