Show simple item record

contributor authorJason M. North
contributor authorJennifer G. Becker
contributor authorEric A. Seagren
contributor authorMark Ramirez
contributor authorChristopher Peot
contributor authorSudhir N. Murthy
date accessioned2017-05-08T22:01:59Z
date available2017-05-08T22:01:59Z
date copyrightSeptember 2008
date issued2008
identifier other%28asce%290733-9372%282008%29134%3A9%28762%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69309
description abstractPostlime stabilization of municipal sludge requires methods for assessing the degree of lime incorporation and stability of the final product, as well as for evaluating and monitoring the performance of individual components in the process. The goal of this research was to systematically apply selected measures of lime incorporation and stability at the District of Columbia Water and Sewer Authority’s Blue Plains advanced wastewater treatment plant (see the companion paper). The transfer of sludge by screw conveyance prior to the lime blender did not appear to make it more difficult to incorporate lime in a bench-scale mixer. However, in the full-scale system, it may impede mixing by rolling the sludge into large plugs, and thus creating a discontinuous supply of sludge to the blender. Screw conveyance of limed sludge downstream from the blender appears to subject the limed sludge to additional mixing, resulting in improved lime incorporation and stabilization. The impact of lime purity
publisherAmerican Society of Civil Engineers
titleMethods for Quantifying Lime Incorporation into Dewatered Sludge. II: Field-Scale Application
typeJournal Paper
journal volume134
journal issue9
journal titleJournal of Environmental Engineering
identifier doi10.1061/(ASCE)0733-9372(2008)134:9(762)
treeJournal of Environmental Engineering:;2008:;Volume ( 134 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record