Show simple item record

contributor authorAhmad Hadavi
contributor authorRaymond J. Krizek
date accessioned2017-05-08T21:59:41Z
date available2017-05-08T21:59:41Z
date copyrightSeptember 1993
date issued1993
identifier other%28asce%290733-9364%281993%29119%3A3%28622%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/68397
description abstractGoal setting is one of the motivational techniques used in manufacturing and service industries to improve the productivity of the workforce, and previous studies have shown that goal setting can result in up to 20% increase in productivity. However, this technique has not been applied to construction projects due to the inherent characteristics of the construction industry and difficulties in implementing the technique at construction sites. To study the applicability of goal setting in construction, three experiments were performed over a period of 14 months. In all three experiments, the groups with a goal outperformed the groups without a goal. This increased performance is shown by higher expected profits at each experimental site. Comparison of all three experiments allows conclusions to be advanced that: (1) Goal setting induced increased productivity of unionized groups with a goal; and (2) short‐term goals resulted in higher productivity than long‐term goals.
publisherAmerican Society of Civil Engineers
titleShort‐Term Goal Setting for Construction
typeJournal Paper
journal volume119
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1993)119:3(622)
treeJournal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record