Show simple item record

contributor authorReggie L. Rowe
contributor authorVani Kathula
contributor authorCourtney Call Kennedy
date accessioned2017-05-08T21:57:58Z
date available2017-05-08T21:57:58Z
date copyrightMay 2010
date issued2010
identifier other%28asce%29ps%2E1949-1204%2E0000103.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/67607
description abstractTraditional asset internal condition assessment inspection techniques gather data that improve the understanding of an asset’s condition and capacity performance. Inspection data are difficult to compile because of the differing ways the inspection data are collected and documented. This drove the need for a modified data collection and analysis process. An integrated asset scoring and multiple inspection scoring process was developed after reviewing and assessing the availability of existing industry approaches. A unique method of applying a common scoring scale of 1–100 to each inspection technique was developed using a combination of advanced root-square-mean mathematical principles. The benefits of the integrated inspection process are that large amounts of field inspection data can be screened, analyzed, and consistently prioritized using automated processes saving considerable labor resources and expediting corrective action solutions. These features will aide utility owner efforts to efficiently and effectively address both asset management and capacity driven projects.
publisherAmerican Society of Civil Engineers
titleIntegrated Conveyance Condition Assessment Techniques Support Asset Management and Capacity Driven Projects
typeJournal Paper
journal volume1
journal issue2
journal titleJournal of Pipeline Systems Engineering and Practice
identifier doi10.1061/(ASCE)PS.1949-1204.0000055
treeJournal of Pipeline Systems Engineering and Practice:;2010:;Volume ( 001 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record