Show simple item record

contributor authorZ. Ren
contributor authorG. Q. Shen
contributor authorX. L. Xue
date accessioned2017-05-08T21:54:37Z
date available2017-05-08T21:54:37Z
date copyrightJanuary 2013
date issued2013
identifier other%28asce%29me%2E1943-5479%2E0000150.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66177
description abstractConstruction method selection, implementation, and improvement (CMSII) is a crucial and difficult task for construction projects, especially for large and complex projects, which often face constraints such as complex project environment, lack of information, and uncertainties caused by new technologies. Despite its importance, few research projects have been conducted in this field, especially from both technical and management points of view. Although cases of project failure caused by inappropriate construction methods are reported from time to time, studies of the detailed causes and lessons learned are rare. This research developed a CMSII workflow model and discussed the CMSII process in a drainage project that suffered multimillion-dollar losses due to problems associated with CMSII. By investigating the details of the CMSII, this study identifies the key technical and management issues to be considered in each CMSII stage, reveals the problems, and, most importantly, summarizes the lessons learned.
publisherAmerican Society of Civil Engineers
titleFailure Caused by Inappropriate Construction Methods: An Expensive Lesson
typeJournal Paper
journal volume29
journal issue1
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000117
treeJournal of Management in Engineering:;2013:;Volume ( 029 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record