Show simple item record

contributor authorChangYoon Ji
contributor authorTaeHoon Hong
contributor authorChangTaek Hyun
date accessioned2017-05-08T21:54:26Z
date available2017-05-08T21:54:26Z
date copyrightOctober 2010
date issued2010
identifier other%28asce%29me%2E1943-5479%2E0000052.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66080
description abstractFor any construction project to succeed, it is very important to accurately estimate the construction cost during the project’s initial stage. This is why there has been much interest lately in cost prediction models that use case-based reasoning (CBR). It has been pointed out, however, that existing CBR-based cost prediction models may yield inaccurate results even though they could survey optimal similar cases, if the number of cases in the case base is not enough. As opposed to the existing CBR-based construction cost prediction models, this study developed a CBR revision model that reflects the “revise” phase of the CBR cycle (retrieve, reuse, revise, and retain) based on nine multifamily housing projects executed recently by “A” Housing Corporation. To verify the developed model, a case study was performed using three case projects completed by “B” and “C” Housing Corporations. The result showed that the prediction error ratio after the Revise (I) phase decreased from 97.44 to 22.58%. This model can be effective when there are insufficient established cases in the case base.
publisherAmerican Society of Civil Engineers
titleCBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects
typeJournal Paper
journal volume26
journal issue4
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000018
treeJournal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record