contributor authorTimothy D. Stark
contributor authorTimothy P. Ristau
contributor authorPerry J. Ricciardi
contributor authorMichael J. Ciammaichella
date accessioned2017-05-08T21:54:09Z
date available2017-05-08T21:54:09Z
date copyrightMay 2014
date issued2014
identifier other%28asce%29lm%2E1943-5630%2E0000068.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65895
description abstractThis four-year project was extremely successful and well executed, even though a number of changed conditions developed during the project. Of these changed conditions, only one resulted in a claim that is discussed herein. This claim involved responsibility for repairing a failed 7-m-high embankment that was widened as part of the contract. This paper discusses the slope movement mechanism, presents the relevant contract provisions and State of Ohio Construction and Material Specifications (C&MS), summarizes the various contract interpretations that developed, and the recommendation of the Dispute Resolution Board (DRB) to resolve this claim. Based on the case study, recommendations for clarifying project plans and specifications for future embankment construction are also presented.
publisherAmerican Society of Civil Engineers
titleHighway Embankment Contract Specifications
typeJournal Paper
journal volume6
journal issue2
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/(ASCE)LA.1943-4170.0000136
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2014:;Volume ( 006 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record