description abstractThis paper demonstrates detailed schedule‐ and cost‐control relationships at the activity/cost‐account level using generic microcomputer software to budget, track, and control projects. Time variances are introduced to describe differences between scheduled times and actual times for activity and project performance. Variances are the sum of more detailed variances, and variances can be calculated and reported at different levels of detail, whether for activities and cost accounts or for a project as a whole. Activity/cost‐account budgets sum to project budgets, and variances sum to project variances. A unified nomenclature and parallel budget and variance structures allow integration of cost and schedule control for projects that share common work breakdown structures. Budget, actual, and variance values of cost, progress, and time are combined in a single figure to demonstrate integration at the activity/cost‐account level. Equation development is augmented with computer implementation details for generic spreadsheets or custom applications. Examples are presented for a single element from start to completion and for a project of four elements.
publisherAmerican Society of Civil Engineers
titleCost, Schedule, and Time Variances and Integration
typeJournal Paper
journal volume119
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1993)119:2(245)
treeJournal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 002