| contributor author | Bo Zou | |
| contributor author | Samer Madanat | |
| date accessioned | 2017-05-08T21:53:46Z | |
| date available | 2017-05-08T21:53:46Z | |
| date copyright | September 2012 | |
| date issued | 2012 | |
| identifier other | %28asce%29is%2E1943-555x%2E0000114.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/65671 | |
| description abstract | This paper presents an approach to address pavement management decision problems at airports with multiple runways. It relaxes some of the underlying assumptions made in previous studies and explicitly considers time requirements for runway reconstruction, deterioration dependence on traffic levels, and the growth of traffic demand over time. A finite-horizon dynamic program is formulated to investigate the interplays among maintenance and repair (M&R) action time, functional interdependence between runways, and traffic growth. Results from computational studies reveal these interplays, in particular the tradeoff between present M&R action and delay cost and long-term benefits brought by significantly upgrading pavement conditions through reconstructing runways. Sensitivity analyses suggest that baseline demand, demand growth rate, and the parameter differentiating traffic-dependent transition probabilities significantly affect optimal M&R decisions and total expected cost to go. | |
| publisher | American Society of Civil Engineers | |
| title | Incorporating Delay Effects into Airport Runway Pavement Management Systems | |
| type | Journal Paper | |
| journal volume | 18 | |
| journal issue | 3 | |
| journal title | Journal of Infrastructure Systems | |
| identifier doi | 10.1061/(ASCE)IS.1943-555X.0000086 | |
| tree | Journal of Infrastructure Systems:;2012:;Volume ( 018 ):;issue: 003 | |
| contenttype | Fulltext | |