contributor authorH. Hettiarachchi
contributor authorJ. P. A. Hettiaratchi
contributor authorC. A. Hunte
contributor authorJ. N. Meegoda
date accessioned2017-05-08T21:52:18Z
date available2017-05-08T21:52:18Z
date copyrightOctober 2013
date issued2013
identifier other%28asce%29hz%2E2153-5515%2E0000187.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/64855
description abstractThis manuscript presents a detailed discussion of the challenges faced and lessons learned during the initial phase of operation of the Calgary Biocell. The Calgary Biocell is a full-scale pilot project that has been implemented to acquire data and demonstrate the applicability of the biocell concept under severe winter conditions. The biocell concept involves operating a waste cell in three phases: first as an anaerobic bioreactor to recover biogas and produce energy, second as an aerobic bioreactor or an in-ground composter, and finally mined to recover processed waste and land for reuse. The Calgary Biocell has been in operation in its first phase, as an anaerobic bioreactor, for over the past five years. The cell was equipped with sensors to gather performance data during anaerobic and aerobic bioreactor operation. The settlement, moisture content, pressure, and temperature sensors provided early data, but failed after several months of cell operation. Regular monitoring and repairs were performed to ensure that gas was captured and used to generate power. The waste settlement data were collected during waste placement and before final closure of the cell from various depths of the cell. Lift 1 reported approximately 700 mm of settlement, which is approximately 14% strain, when the biocell was ready to be capped. After closure, only a limited amount of waste settlement data could be collected because of the failure of the settlement sensors and the real time data gathering system. The automated leachate recirculation system also failed during the past five years and was repaired. The liquid level of the leachate sump during automated operation was more consistent. The average initial and final moisture contents of MSW in the biocell were found to be at 25 and 36%, respectively, whereas the field capacity was determined to be 44% (wet basis). The temperature of landfill gas leaving the biocell ranged between 3 and 12°C in the winter/spring and approximately 20°C during summer. The landfill gas production rate averaged
publisherAmerican Society of Civil Engineers
titleOperation of a Landfill Bioreactor in a Cold Climate: Early Results and Lessons Learned
typeJournal Paper
journal volume17
journal issue4
journal titleJournal of Hazardous, Toxic, and Radioactive Waste
identifier doi10.1061/(ASCE)HZ.2153-5515.0000159
treeJournal of Hazardous, Toxic, and Radioactive Waste:;2013:;Volume ( 017 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record