Show simple item record

contributor authorKyong Ju Kim
contributor authorKyoungmin Kim
date accessioned2017-05-08T21:40:17Z
date available2017-05-08T21:40:17Z
date copyrightNovember 2010
date issued2010
identifier other%28asce%29cp%2E1943-5487%2E0000059.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59017
description abstractThe purpose of this study is to evaluate the effects of traffic flow of construction equipment. A large construction project requires large quantities of construction equipment. This volume can result in traffic congestion in the flow of construction equipment, which also lowers the overall efficiency of construction operations. In particular, this effect can be serious in the area where traffic bottlenecks are most likely. This study applies a multiagent-based simulation modeling approach to a real project. Through a case study, this study evaluates how traffic flow of construction equipment influences the efficiency of that equipment in construction operations and, moreover, the schedule of a project.
publisherAmerican Society of Civil Engineers
titleCase Study on the Evaluation of Equipment Flow at a Construction Site
typeJournal Paper
journal volume24
journal issue6
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)CP.1943-5487.0000051
treeJournal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record