Show simple item record

contributor authorMarina Marinelli
contributor authorSergios Lambropoulos
date accessioned2017-05-08T21:39:54Z
date available2017-05-08T21:39:54Z
date copyrightMay 2013
date issued2013
identifier other%28asce%29co%2E1943-7862%2E0000632.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58793
description abstractScrapers have established an important position in the earthmoving field as they are independently capable of accomplishing an earthmoving operation. Given that loading a scraper to its capacity does not entail its maximum production, optimizing the scraper’s loading time is an essential prerequisite for successful operations management. The relevant literature addresses the loading time optimization through a graphical method that is founded on the invalid assumption that the hauling time is independent of the load time. To correct this, a new algorithmic optimization method that incorporates the golden section search and the bisection algorithm is proposed. Comparison of the results derived from the proposed and the existing method demonstrates that the latter entails the systematic needless prolongation of the loading stage thus resulting in reduced hourly production and increased cost. Therefore, the proposed method achieves an improved modeling of scraper earthmoving operations and contributes toward a more efficient cost management.
publisherAmerican Society of Civil Engineers
titleAlgorithmic Method for Scraper Load-Time Optimization
typeJournal Paper
journal volume139
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000624
treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record