Show simple item record

contributor authorAmin Alvanchi
contributor authorSangHyun Lee
contributor authorSimaan AbouRizk
date accessioned2017-05-08T21:39:30Z
date available2017-05-08T21:39:30Z
date copyrightJanuary 2012
date issued2012
identifier other%28asce%29co%2E1943-7862%2E0000390.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58544
description abstractThe effects of different aspects of working hours on performance, including length of work and rest periods, time of day, and amount of set overtime, have been studied separately by scholars from different disciplines, including construction. Most of these studies have accounted for specific factors and for specific types of work. Current approaches fall short of enabling a work manager to estimate the impact of various working-hour arrangements on productivity with a reasonable degree of accuracy. We have developed a dynamic modeling tool that can be used for estimating expected productivity in a range of construction jobs for different working-hour arrangements. Through this dynamic modeling tool, construction managers can see the expected effects of working-hour changes on productivity and adjust work-hour schedules to improve productivity. To test the applicability of the model, it has been applied to a real construction case, and the effects of different working-hour arrangements on productivity have been investigated.
publisherAmerican Society of Civil Engineers
titleDynamics of Working Hours in Construction
typeJournal Paper
journal volume138
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000384
treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 001
contenttypeFulltext