Show simple item record

contributor authorRobert McTavish
contributor authorRobert Stallard
date accessioned2017-05-08T21:39:19Z
date available2017-05-08T21:39:19Z
date copyrightOctober 2011
date issued2011
identifier other%28asce%29co%2E1943-7862%2E0000304.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58454
description abstractThe factors that are considered in analyzing technical solutions and the tools used to obtain technical solutions have changed for construction engineers over the past 30 years. This paper discusses these changes and their impacts. It then outlines a process that several heavy civil contracting firms use to generate work plans for their field operations, using the details of the process at Granite Construction as an example. The paper concludes by identifying the key factors in the success of a work plan and providing some thoughts on what construction engineering education should emphasize.
publisherAmerican Society of Civil Engineers
titleConstruction Engineering Today1
typeJournal Paper
journal volume137
journal issue10
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000298
treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record