description abstractSchedule delays are common in construction projects. Although many methods have been developed for analyzing and measuring schedule delays for construction projects, each method has functional limitations and use prerequisites. No one method is acceptable for all project participants under all circumstances. This study presents the isolated collapsed but-for (ICBF) method, an innovative delay analysis method for construction projects. During analysis, the ICBF method requires as-planned and as-built schedules as well as identified liability documents with key delay events to perform its analysis approach. Based on its application to an illustrative case and comparisons with other methods, the ICBF method is effective for delay analysis. Results provided by the proposed method can be easily traced to the actual case in an as-built schedule.
publisherAmerican Society of Civil Engineers
titleIsolated Collapsed But-For Delay Analysis Methodology
typeJournal Paper
journal volume135
journal issue7
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000016
treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record