Show simple item record

contributor authorLakshmanan
contributor authorRavisankar
contributor authorMuthumani
contributor authorT. S.
contributor authorKrishnamoorthy
contributor authorRamanjaneyulu
contributor authorGopalakrishnan
contributor authorNagesh R.
contributor authorIyer
date accessioned2017-05-08T21:37:38Z
date available2017-05-08T21:37:38Z
date copyrightDecember 2012
date issued2012
identifier other%28asce%29cf%2E1943-5509%2E0000286.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/57881
description abstractA four-stage procedure for effective management and maintenance scheduling for infrastructural facilities is presented. The structure/component needing immediate attention is identified during the first stage. The second stage investigations reveal local or global damage and also the location of damage, based on the principles of damage assessment. Nondestructive testing and evaluation form the third stage. In the last stage, repair and remedial measures are carried out, which are followed by testing, if necessary. Out of the case study examples presented, two are specific to the third and fourth stage evaluation only, while one case study example is explained in full.
publisherAmerican Society of Civil Engineers
titleManagement and Maintenance Scheduling of Infrastructural Facilities: Road Map
typeJournal Paper
journal volume26
journal issue6
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0000283
treeJournal of Performance of Constructed Facilities:;2012:;Volume ( 026 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record