Show simple item record

contributor authorAaron
contributor authorLarosche
contributor authorMark
contributor authorCukrov
contributor authorDavid
contributor authorSanders
contributor authorPaul
contributor authorZiehl
date accessioned2017-05-08T21:35:59Z
date available2017-05-08T21:35:59Z
date copyrightMarch 2014
date issued2014
identifier other%28asce%29be%2E1943-5592%2E0000562.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/57112
description abstractThe South Carolina DOT employs a detail in which piles are plainly embedded into bent caps without the use of any special detailing to the pile. The behavior of these connections is of special concern in areas where seismic activity poses a threat to infrastructure. This paper discusses the experimental results of a full-scale three-pile bent specimen subjected to a modified earthquake displacement history. This study is significant in the type of loading applied, the scale of the specimen, the inclusion of multiple piles, and the evaluation of differing bent cap reinforcement designs. The specimen was the culmination of an experimental research effort that included eight full-scale single-pile specimens. Results of the full-scale experiment and a numerical model are used for evaluation of the connection as well as comparison between differing reinforcement designs at exterior ends of the bent cap. These results include concrete cracking and spalling, strand slippage, ductility, and the amount of confinement at each connection.
publisherAmerican Society of Civil Engineers
titlePrestressed Pile to Bent Cap Connections: Seismic Performance of a Full-Scale Three-Pile Specimen
typeJournal Paper
journal volume19
journal issue3
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0000560
treeJournal of Bridge Engineering:;2014:;Volume ( 019 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record