Show simple item record

contributor authorBrock D.
contributor authorHedegaard
contributor authorCatherine E. W.
contributor authorFrench
contributor authorCarol K.
contributor authorShield
contributor authorHenryk K.
contributor authorStolarski
contributor authorBen J.
contributor authorJilk
date accessioned2017-05-08T21:35:28Z
date available2017-05-08T21:35:28Z
date copyrightJune 2013
date issued2013
identifier other%28asce%29be%2E1943-5592%2E0000386.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56930
description abstractThe I-35W St. Anthony Falls Bridge was constructed to replace the steel truss bridge that collapsed on August 1, 2007. The design of the replacement bridge featured a smart-bridge system. The smart-bridge concept included instrumentation for long-term monitoring of the structural behavior of the bridge. Truck-load tests were conducted prior to opening the bridge and 26 months later to measure the response of the structure under controlled loading. The measurements were used to validate a FEM model of the bridge constructed to further investigate the behavior of the structure. The correlation between computed and measured results was found to be good. This paper describes the bridge, the instrumentation installed within the bridge, the FEM model, and validation of the model with respect to the truck-load tests. Recommendations are provided for static instrumentation plans of concrete box-girder structures.
publisherAmerican Society of Civil Engineers
titleInstrumentation and Modeling of I-35W St. Anthony Falls Bridge
typeJournal Paper
journal volume18
journal issue6
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0000384
treeJournal of Bridge Engineering:;2013:;Volume ( 018 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record