Show simple item record

contributor authorKangas
contributor authorHelmicki
contributor authorHunt
contributor authorSexton
contributor authorSwanson
date accessioned2017-05-08T21:35:25Z
date available2017-05-08T21:35:25Z
date copyrightNovember 2012
date issued2012
identifier other%28asce%29be%2E1943-5592%2E0000366.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56908
description abstractA cable-stayed bridge recently constructed by the Ohio Department of Transportation incorporates measures put forth by a Federal Highway Administration study to mitigate stay motion. In following recent trends, the stays at this bridge are built without the use of grout for the purposes of inspection and, if necessary, replacement. Several experiments were performed to determine the viability of using traditional vibration techniques, which assume an integral sheath, to estimate cable tension with this new configuration.
publisherAmerican Society of Civil Engineers
titleCable-Stayed Bridges: Case Study for Ambient Vibration-Based Cable Tension Estimation
typeJournal Paper
journal volume17
journal issue6
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0000364
treeJournal of Bridge Engineering:;2012:;Volume ( 017 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record