Show simple item record

contributor authorBrent M.
contributor authorPhares
contributor authorAdam S.
contributor authorFaris
contributor authorLowell
contributor authorGreimann
contributor authorDean
contributor authorBierwagen
date accessioned2017-05-08T21:35:22Z
date available2017-05-08T21:35:22Z
date copyrightFebruary 2013
date issued2013
identifier other%28asce%29be%2E1943-5592%2E0000335.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/56877
description abstractThis paper presents the findings of a performance investigation of two approach slabs (a cast-in-place slab and a precast panel slab) integrally connected to two parallel bridges. The goal of using the integral connection is to eliminate the bump at the end of the bridge. To measure the performance, a long-term structural monitoring system consisting of various vibrating wire transducers was installed. From the year-long monitoring, the following general conclusions were made: (1) the integral connection functions well, with no observed distress or relative movement between the approach slab and bridge; (2) most of the force at the integral connection is induced by forces at the pavement/approach slab expansion joint; and (3) the observed responses generally followed an annual cycle, with short-term ratcheting patterns also apparent.
publisherAmerican Society of Civil Engineers
titleIntegral Bridge Abutment to Approach Slab Connection
typeJournal Paper
journal volume18
journal issue2
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0000333
treeJournal of Bridge Engineering:;2013:;Volume ( 018 ):;issue: 002
contenttypeFulltext