Show simple item record

contributor authorAhmad Hadavi
contributor authorRaymond J. Krizek
date accessioned2017-05-08T21:33:22Z
date available2017-05-08T21:33:22Z
date copyrightSeptember 1994
date issued1994
identifier other%28asce%299742-597x%281994%2910%3A5%2848%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55994
description abstractGoal setting has an established record of improving the productivity of the workforce in manufacturing and service industries, and a programmatic use of goal setting and feedback has been shown to increase productivity by up to 20%. In addition, previous studies have shown that specific, difficult goals produce better performance than any of medium, easy, or do‐your‐best goals; or no goals. However, notwithstanding its potential for productivity improvement, attempts to apply goal setting to construction projects have been limited due to the inherent characteristics of the construction industry and the associated difficulties in implementation. Based on results obtained from two widely different studies, many of the obstacles for successful implementation of goal setting in the construction industry are explicitly identified, suggestions for dealing with them are advanced, and productivity is shown to increase from 10% to more than 20%.
publisherAmerican Society of Civil Engineers
titleDifficulties with Implementation of Goal Setting for Construction
typeJournal Paper
journal volume10
journal issue5
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)9742-597X(1994)10:5(48)
treeJournal of Management in Engineering:;1994:;Volume ( 010 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record