Show simple item record

contributor authorSukamal (Sam) Goswami
date accessioned2017-05-08T21:33:12Z
date available2017-05-08T21:33:12Z
date copyrightJanuary 1993
date issued1993
identifier other%28asce%299742-597x%281993%299%3A1%2891%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55895
description abstractAs we move further into a technological era, civil engineering firms are getting more and more involved with computerized supervisory control and data acquisition (SCADA) projects for water distribution systems, pipeline monitoring and freeway operations. A large number of computerized SCADA projects have failed to perform their requirements, and have incurred massive cost overrun due to factors such as a lack of project management guidelines, insuficient funding, unskilled personnel, incomplete design and documentation, hiring contractors without engineering design experience and underbidding by the contractors. Suggested solutions to these problems include familiarity with industrial processes, a qualified engineering team, system‐requirement studies, well‐designed construction documents, proper design of the communication link, efficient usage of application software, retaining the same engineering team through project completion, development of standards and guidelines. Civil engineers working with control engineers can resolve the current problems of computerized control projects so that U.S. companies can regain their dominance before the start of the 21st century.
publisherAmerican Society of Civil Engineers
titleEffective Management in Computerized SCADA System
typeJournal Paper
journal volume9
journal issue1
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)9742-597X(1993)9:1(91)
treeJournal of Management in Engineering:;1993:;Volume ( 009 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record