Show simple item record

contributor authorRichard S. Reis
date accessioned2017-05-08T21:29:34Z
date available2017-05-08T21:29:34Z
date copyrightOctober 1997
date issued1997
identifier other%28asce%291090-025x%281997%291%3A4%28151%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53544
description abstractThe U.S. Navy has operated a military installation at Adak Island, Ala., since 1943. Jet fuel (JP-5) has been used as the primary fuel source on the island, including use as heating oil in the housing areas. Releases of JP-5 to the subsurface were discovered in three housing areas in 1988, and a product recovery system was installed in 1989. The original product recovery system consisted of 17 recovery wells with dual-phase pumps. Recovered product was pumped into storage tanks for recycling on Adak. Recovered water was discharged to the sanitary sewer. The volume of product recovered by the system had declined steadily since installation. In 1993, the Navy decided to investigate and evaluate the operational status and effectiveness of the existing recovery systems. This investigation determined that the product recovery systems were not operating as designed and that some of the plumes had migrated further beyond the effective zone of capture of the existing recovery wells. Several alternative recovery system designs were identified that would effectively remediate the jet fuel product plumes while minimizing ongoing maintenance requirements.
publisherAmerican Society of Civil Engineers
titleDesign of Free Product Recovery System for Jet Fuel
typeJournal Paper
journal volume1
journal issue4
journal titlePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management
identifier doi10.1061/(ASCE)1090-025X(1997)1:4(151)
treePractice Periodical of Hazardous, Toxic, and Radioactive Waste Management:;1997:;Volume ( 001 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record