Show simple item record

contributor authorR. Guo
contributor authorD. Dixon
contributor authorJ. Martino
date accessioned2017-05-08T21:28:21Z
date available2017-05-08T21:28:21Z
date copyrightJanuary 2006
date issued2006
identifier other%28asce%291090-0241%282006%29132%3A1%2812%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/52775
description abstractThe Tunnel Sealing Experiment (TSX) was an international project developed by Canada, Japan, France, and the United States. The TSX consisted of a clay bulkhead and a concrete bulkhead. The two bulkheads were at opposite ends of a 12-m-long sand-filled chamber. The heating phase involved the circulation of heated water through the TSX chamber to raise the temperature of the sealing system. This was done to evaluate the influence of elevated temperature on the performance of the bulkheads. Numerical analyses to simulate the thermohydromechanical evolution of the clay bulkhead and the surrounding rock of the TSX were performed using MOTIF finite-element program and compared with measured data. This paper focuses on a preliminary interpretation of the results from the fully coupled thermohydromechanical modeling of the clay bulkhead and the adjacent rock during heating. Discussion of the issues that will affect the ability to model a field application is provided in the course of comparing simulated and measured results.
publisherAmerican Society of Civil Engineers
titleThermohydromechanical Modeling of a Full-Scale Tunnel Sealing Clay Bulkhead
typeJournal Paper
journal volume132
journal issue1
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)1090-0241(2006)132:1(12)
treeJournal of Geotechnical and Geoenvironmental Engineering:;2006:;Volume ( 132 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record