description abstractThe application of cable‐stayed structures has increased during the last few years in North America. The implementation of these new structures has led to serious problems in the design and construction process. This paper provides an analysis of the most significant problems identified by owners, designers, and contractors. The owner‐related problems include difficulties in four areas: the contract system, the bidding process, field representation, and project document reviews. Designer‐related problems include incomplete design, lack of access to specification development, overly congested areas, and restrictive tolerances. Constructor‐related problems include engineering requirements, inexperienced personnel, project planning, and shop‐drawing specification. The paper proposes several modifications to mitigate the problems encountered. The paper includes suggested changes under the current contract environment, a modified current contract environment, and a completely new contracting approach for bridge construction. Each of the suggested changes are explained and analyzed for their potential benefits to the project outcome.
publisherAmerican Society of Civil Engineers
titleConstructability of Cable‐Stayed Bridges
typeJournal Paper
journal volume117
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1991)117:2(259)
treeJournal of Construction Engineering and Management:;1991:;Volume ( 117 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record