description abstractFor more than two decades diaphragm walling has become commonly used for the construction of deep excavations in Hong Kong. For example, 13 of the main excavations for the Island Line of the Mass Transit Railway (MTR), completed in 1986, adopted diaphragm walls as the principal support to the excavation. Diaphragm walls were particularly appropriate to the MTR construction in over-crowded urban Hong Kong, limiting adverse effects on surrounding buildings and allowing top-down construction methods, thus reducing programming time. Settlement was predicted for buildings on deep foundations (piles), adjacent to deep excavations, and the actual settlement was monitored by conventional surveying techniques. The results indicate that settlement due to diaphragm walling is generally substantial and that preconstruction activities such as ground treatment, drilling, and preboring for wall panels, must be taken into account in any settlement predictions.
publisherAmerican Society of Civil Engineers
titleSettlement due to Diaphragm Wall Construction in Reclaimed Land in Hong Kong
typeJournal Paper
journal volume128
journal issue6
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)1090-0241(2002)128:6(473)
treeJournal of Geotechnical and Geoenvironmental Engineering:;2002:;Volume ( 128 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record