description abstractThe paper describes the heavy damages caused by blasting in the Peruća rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described.
publisherAmerican Society of Civil Engineers
titleWar Damages and Reconstruction of Peruća Dam
typeJournal Paper
journal volume125
journal issue4
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)1090-0241(1999)125:4(280)
treeJournal of Geotechnical and Geoenvironmental Engineering:;1999:;Volume ( 125 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record