| contributor author | B. W. Chavel | |
| contributor author | C. J. Earls | |
| date accessioned | 2017-05-08T21:25:27Z | |
| date available | 2017-05-08T21:25:27Z | |
| date copyright | January 2006 | |
| date issued | 2006 | |
| identifier other | %28asce%291084-0702%282006%2911%3A1%2891%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/50899 | |
| description abstract | The erection of horizontally curved steel I-girder bridges tends to be more complex than the erection of straight steel I-girder bridges. The erection of a curved steel I-girder bridge can be further complicated when the cross-frame members and girders are detailed inconsistently in an effort to force bridge components into some desirable geometric condition. Inconsistent detailing involves the intentional specification of cross-frame members that are either too long or too short to align with girder connector plates properly so as to force the girders into a given position, resulting in connection misalignments that must be resolved by applying external forces to the bridge components. The current research investigates the erection of a recently constructed horizontally curved steel I-girder bridge and highlights the fact that practice of inconsistent detailing can lead to very formidable and costly fit-up problems in the field; especially when girder sizes are large. | |
| publisher | American Society of Civil Engineers | |
| title | Construction of a Horizontally Curved Steel I-Girder Bridge. Part II: Inconsistent Detailing | |
| type | Journal Paper | |
| journal volume | 11 | |
| journal issue | 1 | |
| journal title | Journal of Bridge Engineering | |
| identifier doi | 10.1061/(ASCE)1084-0702(2006)11:1(91) | |
| tree | Journal of Bridge Engineering:;2006:;Volume ( 011 ):;issue: 001 | |
| contenttype | Fulltext | |