Show simple item record

contributor authorZ. “Zee” Manko
contributor authorD. Beben
date accessioned2017-05-08T21:25:21Z
date available2017-05-08T21:25:21Z
date copyrightSeptember 2005
date issued2005
identifier other%28asce%291084-0702%282005%2910%3A5%28570%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50861
description abstractThe way in which a new road bridge made of steel corrugated plates Super Cor type was tested during the three stages of its construction is described and the test results are presented. Backfill in construction Stage I and two ballasting vehicles in Stages II and III constituted the loads. The box bridge spans the Bystrzyca Dusznicka River in Polanica Zdroj, Poland. The span’s effective length is
publisherAmerican Society of Civil Engineers
titleTests During Three Stages of Construction of a Road Bridge with a Flexible Load-Carrying Structure Made of Super Cor Type Steel Corrugated Plates Interacting with Soil
typeJournal Paper
journal volume10
journal issue5
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)1084-0702(2005)10:5(570)
treeJournal of Bridge Engineering:;2005:;Volume ( 010 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record