Show simple item record

contributor authorLawrence A. J. Fennessey
contributor authorJames M. Hamlett
contributor authorGert Aron
contributor authorDavid LaSota
date accessioned2017-05-08T21:23:28Z
date available2017-05-08T21:23:28Z
date copyrightAugust 2001
date issued2001
identifier other%28asce%291084-0699%282001%296%3A4%28317%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49595
description abstractA continuous simulation stormwater management model (with 33 years of historical precipitation) was used to determine how the design criteria from five different stormwater management pond ordinances changed the runoff from a 7.77 ha watershed following a hypothetical development scenario. All five evaluated ordinances required that the postdevelopment runoff rates from the site be less than or equal to the predevelopment runoff rates for each return period (a zero increase criteria). However, none of the five ordinances were effective at limiting the increase in runoff peak rates for the 1- and 2-year return periods for the annual runoff series, the 1-year return period for the annual exceedance (partial) runoff series duration, or more frequent precipitation events. To better control the lower frequency runoff events from stormwater ponds, the 1- and 2-year return periods should always be analyzed for a basin's design. Additionally, there was a radical change in the frequency of small and moderate runoff events occurring from the watershed following the hypothetical development.
publisherAmerican Society of Civil Engineers
titleChanges in Runoff due to Stormwater Management Pond Regulations
typeJournal Paper
journal volume6
journal issue4
journal titleJournal of Hydrologic Engineering
identifier doi10.1061/(ASCE)1084-0699(2001)6:4(317)
treeJournal of Hydrologic Engineering:;2001:;Volume ( 006 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record