Show simple item record

contributor authorDavid Duerr
date accessioned2017-05-08T21:22:59Z
date available2017-05-08T21:22:59Z
date copyrightMay 2008
date issued2008
identifier other%28asce%291084-0680%282008%2913%3A2%2853%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49282
description abstractThe American Society of Mechanical Engineers has published a new standard for the design of below-the-hook lifting devices. This standard defines design requirements for lifting devices used in conjunction with cranes, derricks, and other types of hoisting equipment. Chapter 3 of the standard addresses the structural design requirements for lifting devices. Although most of the design provisions are based on familiar principles and practices, the provisions for the design of pinned connections are significantly different from more common specification requirements. The discussion and analyses presented in this paper demonstrate that these provisions for the design of pin-connected plates provide reliability equal to or greater than that upon which the design factors in the standard are based, thus demonstrating that these provisions are acceptable for the intended purpose of the design of below-the-hook lifting devices. Also discussed is how to address a pinned connection with a large pin-to-hole clearance.
publisherAmerican Society of Civil Engineers
titleASME BTH-1 Pinned Connection Design Provisions
typeJournal Paper
journal volume13
journal issue2
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(2008)13:2(53)
treePractice Periodical on Structural Design and Construction:;2008:;Volume ( 013 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record