description abstractThe objectives of the research reported in this paper were to monitor and document the rapid bridge deck replacement work of the Georgia Department of Transportation (GDOT) on two bridges in Gainesville, Ga., and two bridges in Atlanta. Documentation of the GDOT work included a time sequence, deck replacement square footage per work period, total construction time, typical work period construction tasks, and photographic display/discussion of the deck replacement work. The precast exodermic deck panel system used by the GDOT provided an excellent means for rapid bridge deck replacement while under staged construction/concurrent traffic conditions. The GDOT work was completed within the imposed time limits while maintaining minimum traffic interruption.
publisherAmerican Society of Civil Engineers
titleRapid Replacement of Four GDOT Bridge Decks
typeJournal Paper
journal volume12
journal issue1
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(2007)12:1(48)
treePractice Periodical on Structural Design and Construction:;2007:;Volume ( 012 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record