| contributor author | Nancy L. Holland | |
| contributor author | Dana Hobson Jr | |
| date accessioned | 2017-05-08T21:21:53Z | |
| date available | 2017-05-08T21:21:53Z | |
| date copyright | June 1999 | |
| date issued | 1999 | |
| identifier other | %28asce%291076-0431%281999%295%3A2%2849%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/48566 | |
| description abstract | In many instances, the architect/engineer is responsible for the drafting of construction contracts. The importance of the drafter's clearly defining direct and indirect costs for contract items receiving cost reimbursement is reinforced by this survey of contractors. The survey asks contractors to classify a list of 44 items as their company would, with respect to project and home-office overhead and direct and indirect costs. The results of the survey indicate a lack of standard usage of these terms by industry. The survey also is used to investigate the manner in which contractors allocate home-office overhead to contracts. | |
| publisher | American Society of Civil Engineers | |
| title | Indirect Cost Categorization and Allocation by Construction Contractors | |
| type | Journal Paper | |
| journal volume | 5 | |
| journal issue | 2 | |
| journal title | Journal of Architectural Engineering | |
| identifier doi | 10.1061/(ASCE)1076-0431(1999)5:2(49) | |
| tree | Journal of Architectural Engineering:;1999:;Volume ( 005 ):;issue: 002 | |
| contenttype | Fulltext | |