Show simple item record

contributor authorMakarand Hastak
contributor authorMaher M. Abu-Mallouh
date accessioned2017-05-08T21:21:13Z
date available2017-05-08T21:21:13Z
date copyrightJune 2001
date issued2001
identifier other%28asce%291076-0342%282001%297%3A2%2858%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48135
description abstractThis paper describes the MSRP (Model for Station Rehabilitation Planning) for selecting subway stations for rehabilitation. This method evaluates the stations at four different levels: (1) technical/social evaluation including functional criteria and social/community/political criteria; (2) database, which includes cost estimates for partial and full rehabilitation of stations with respect to functional and social/political criteria; (3) funding sources and constraints; and (4) management constraints. The existing procedure for station selection for rehabilitation used by the Metropolitan Transit Authority New York City Transit (MTA NYCT), various criteria used for evaluation, and limitations of the system are described. The development of the MSRP has been explained in relation to the MTA NYCT system requirements, and the procedure of the MSRP has been explained through a hypothetical example. This paper illustrates the results and the benefits of the proposed model for station rehabilitation planning.
publisherAmerican Society of Civil Engineers
titleMSRP: Model for Station Rehabilitation Planning
typeJournal Paper
journal volume7
journal issue2
journal titleJournal of Infrastructure Systems
identifier doi10.1061/(ASCE)1076-0342(2001)7:2(58)
treeJournal of Infrastructure Systems:;2001:;Volume ( 007 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record