Show simple item record

contributor authorN. M. Bradford
contributor authorR. Sen
date accessioned2017-05-08T21:20:33Z
date available2017-05-08T21:20:33Z
date copyrightApril 2004
date issued2004
identifier other%28asce%291052-3928%282004%29130%3A2%2884%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47692
description abstractThis paper examines an ethical dilemma related to the residential construction industry in Florida, where homes must be engineered to withstand extreme load conditions induced during high wind events. Overwhelming contractor pressure to minimize construction costs has resulted in the propagation of inadequate construction designs. The overwhelming adoption of these inadequate designs weakens the integrity of our industry, creating the impression that market pressure can influence our judgment despite conflicting results gained through engineering analysis. This paper illustrates the frailty of engineering judgment as a design fundamental. Further, it raises the question as to what extent professional engineers should substitute engineering judgment for concrete evidence such as numerical analysis or experimental verification.
publisherAmerican Society of Civil Engineers
titleEngineering Judgment and the Design That Got Away
typeJournal Paper
journal volume130
journal issue2
journal titleJournal of Professional Issues in Engineering Education and Practice
identifier doi10.1061/(ASCE)1052-3928(2004)130:2(84)
treeJournal of Professional Issues in Engineering Education and Practice:;2004:;Volume ( 130 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record