| contributor author | Tamer E. El-Diraby | |
| contributor author | James T. O’Connor | |
| date accessioned | 2017-05-08T21:20:32Z | |
| date available | 2017-05-08T21:20:32Z | |
| date copyright | April 2004 | |
| date issued | 2004 | |
| identifier other | %28asce%291052-3928%282004%29130%3A2%28109%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/47681 | |
| description abstract | Research aiming at modeling construction knowledge often faces many problems because of the unique nature of each construction project and the lack of formal data-collection procedures within the industry. Therefore, designing a sound research methodology becomes very important for assuring the validity of this type of research. This paper summarizes the methodology used in the development of a model for evaluating bridge construction plans. It defines some validity threats facing such research efforts and provides some techniques for overcoming them. The case shows that the use of overlapping data-collection tools coupled with rigorous, stepwise analysis of each step in the model development is crucial for research validity. | |
| publisher | American Society of Civil Engineers | |
| title | Lessons Learned in Designing Research Methodology in Field-Based Construction Research | |
| type | Journal Paper | |
| journal volume | 130 | |
| journal issue | 2 | |
| journal title | Journal of Professional Issues in Engineering Education and Practice | |
| identifier doi | 10.1061/(ASCE)1052-3928(2004)130:2(109) | |
| tree | Journal of Professional Issues in Engineering Education and Practice:;2004:;Volume ( 130 ):;issue: 002 | |
| contenttype | Fulltext | |