Show simple item record

contributor authorAmarjit Singh
contributor authorIvan Sakamoto
date accessioned2017-05-08T21:20:20Z
date available2017-05-08T21:20:20Z
date copyrightJuly 2001
date issued2001
identifier other%28asce%291052-3928%282001%29127%3A3%28122%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47551
description abstractA construction case is analyzed where there is a potential for involvement of multiple claims between owner, architect, contractor, subcontractor, and manufacturer. A particular event at a building site causes disturbances where multiple parties are affected. Different questions arise as to the duties and liabilities of the different parties. How does this situation of multiple claims affect the parties responsible? This hypothetical case study used in an educational setting analyzes the liabilities and responsibilities of different parties. Case law support is provided. The study of such a case encourages student learning of the application of contract law in practice.
publisherAmerican Society of Civil Engineers
titleMultiple Claims in Construction Law: Educational Case Study
typeJournal Paper
journal volume127
journal issue3
journal titleJournal of Professional Issues in Engineering Education and Practice
identifier doi10.1061/(ASCE)1052-3928(2001)127:3(122)
treeJournal of Professional Issues in Engineering Education and Practice:;2001:;Volume ( 127 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record